Work content time for a product assembled on a manual production line is 45.0 min. Production…

Resource: PowerPoint Basics Navigate to the PowerPoint BasicsTutorial
September 23, 2022
Personal Statement to study Nursing Degree
September 23, 2022
Show all

Work content time for a product assembled on a manual production line is 45.0 min. Production…

Work content time for a product assembled on a manual production line is 45.0 min. Production rate of the line must he 40 units/hr. Work units are attached to a moving conveyor whose speed e 8 ft/min. Repositioning time per worker is 8 sec, uptime efficiency of the line is 93%,and manning level = 125. Because of imperfect line balancing, it is expected that the number of workers needed on the line will be about 10% more than the number required for perfect balance, if the workstations are arranged in a line, and the length of each station is 12 ft. (a) how long is the entire production line, and (b) what is the elapsed time a work unit spends on the line?

"Do you need a similar assignment done for you from scratch? We have qualified writers to help you with a guaranteed plagiarism-free A+ quality paper. Discount Code: SUPER50!"

order custom paper